📦 deps(skills): sync superpowers
Update Third-party Superpowers / Update thirdparty/skill snapshot (push) Successful in 1m25s

This commit is contained in:
ci-bot
2026-03-12 09:48:00 +00:00
parent 7b84daf3bd
commit 00a07e58db
23 changed files with 1549 additions and 60 deletions
@@ -7,6 +7,8 @@ description: Use when executing implementation plans with independent tasks in t
Execute plan by dispatching fresh subagent per task, with two-stage review after each: spec compliance review first, then code quality review.
**Why subagents:** You delegate tasks to specialized agents with isolated context. By precisely crafting their instructions and context, you ensure they stay focused and succeed at their task. They should never inherit your session's context or history — you construct exactly what they need. This also preserves your own context for coordination work.
**Core principle:** Fresh subagent per task + two-stage review (spec then quality) = high quality, fast iteration
## When to Use
@@ -82,6 +84,39 @@ digraph process {
}
```
## Model Selection
Use the least powerful model that can handle each role to conserve cost and increase speed.
**Mechanical implementation tasks** (isolated functions, clear specs, 1-2 files): use a fast, cheap model. Most implementation tasks are mechanical when the plan is well-specified.
**Integration and judgment tasks** (multi-file coordination, pattern matching, debugging): use a standard model.
**Architecture, design, and review tasks**: use the most capable available model.
**Task complexity signals:**
- Touches 1-2 files with a complete spec → cheap model
- Touches multiple files with integration concerns → standard model
- Requires design judgment or broad codebase understanding → most capable model
## Handling Implementer Status
Implementer subagents report one of four statuses. Handle each appropriately:
**DONE:** Proceed to spec compliance review.
**DONE_WITH_CONCERNS:** The implementer completed the work but flagged doubts. Read the concerns before proceeding. If the concerns are about correctness or scope, address them before review. If they're observations (e.g., "this file is getting large"), note them and proceed to review.
**NEEDS_CONTEXT:** The implementer needs information that wasn't provided. Provide the missing context and re-dispatch.
**BLOCKED:** The implementer cannot complete the task. Assess the blocker:
1. If it's a context problem, provide more context and re-dispatch with the same model
2. If the task requires more reasoning, re-dispatch with a more capable model
3. If the task is too large, break it into smaller pieces
4. If the plan itself is wrong, escalate to the human
**Never** ignore an escalation or force the same model to retry without changes. If the implementer said it's stuck, something needs to change.
## Prompt Templates
- `./implementer-prompt.md` - Dispatch implementer subagent
@@ -93,7 +128,7 @@ digraph process {
```
You: I'm using Subagent-Driven Development to execute this plan.
[Read plan file once: docs/plans/feature-plan.md]
[Read plan file once: docs/superpowers/plans/feature-plan.md]
[Extract all 5 tasks with full text and context]
[Create TodoWrite with all tasks]
@@ -199,6 +234,7 @@ Done!
## Red Flags
**Never:**
- Start implementation on main/master branch without explicit user consent
- Skip reviews (spec compliance OR code quality)
- Proceed with unfixed issues
- Dispatch multiple implementation subagents in parallel (conflicts)
@@ -229,6 +265,7 @@ Done!
## Integration
**Required workflow skills:**
- **superpowers:using-git-worktrees** - REQUIRED: Set up isolated workspace before starting
- **superpowers:writing-plans** - Creates the plan this skill executes
- **superpowers:requesting-code-review** - Code review template for reviewer subagents
- **superpowers:finishing-a-development-branch** - Complete development after all tasks
@@ -17,4 +17,10 @@ Task tool (superpowers:code-reviewer):
DESCRIPTION: [task summary]
```
**In addition to standard code quality concerns, the reviewer should check:**
- Does each file have one clear responsibility with a well-defined interface?
- Are units decomposed so they can be understood and tested independently?
- Is the implementation following the file structure from the plan?
- Did this implementation create new files that are already large, or significantly grow existing files? (Don't flag pre-existing file sizes — focus on what this change contributed.)
**Code reviewer returns:** Strengths, Issues (Critical/Important/Minor), Assessment
@@ -41,6 +41,36 @@ Task tool (general-purpose):
**While you work:** If you encounter something unexpected or unclear, **ask questions**.
It's always OK to pause and clarify. Don't guess or make assumptions.
## Code Organization
You reason best about code you can hold in context at once, and your edits are more
reliable when files are focused. Keep this in mind:
- Follow the file structure defined in the plan
- Each file should have one clear responsibility with a well-defined interface
- If a file you're creating is growing beyond the plan's intent, stop and report
it as DONE_WITH_CONCERNS — don't split files on your own without plan guidance
- If an existing file you're modifying is already large or tangled, work carefully
and note it as a concern in your report
- In existing codebases, follow established patterns. Improve code you're touching
the way a good developer would, but don't restructure things outside your task.
## When You're in Over Your Head
It is always OK to stop and say "this is too hard for me." Bad work is worse than
no work. You will not be penalized for escalating.
**STOP and escalate when:**
- The task requires architectural decisions with multiple valid approaches
- You need to understand code beyond what was provided and can't find clarity
- You feel uncertain about whether your approach is correct
- The task involves restructuring existing code in ways the plan didn't anticipate
- You've been reading file after file trying to understand the system without progress
**How to escalate:** Report back with status BLOCKED or NEEDS_CONTEXT. Describe
specifically what you're stuck on, what you've tried, and what kind of help you need.
The controller can provide more context, re-dispatch with a more capable model,
or break the task into smaller pieces.
## Before Reporting Back: Self-Review
Review your work with fresh eyes. Ask yourself:
@@ -70,9 +100,14 @@ Task tool (general-purpose):
## Report Format
When done, report:
- What you implemented
- **Status:** DONE | DONE_WITH_CONCERNS | BLOCKED | NEEDS_CONTEXT
- What you implemented (or what you attempted, if blocked)
- What you tested and test results
- Files changed
- Self-review findings (if any)
- Any issues or concerns
Use DONE_WITH_CONCERNS if you completed the work but have doubts about correctness.
Use BLOCKED if you cannot complete the task. Use NEEDS_CONTEXT if you need
information that wasn't provided. Never silently produce work you're unsure about.
```