📦 deps(thirdparty): update snapshots

This commit is contained in:
ci[bot]
2026-07-07 08:45:58 +00:00
parent 3b9ece8c79
commit 7a1900c015
238 changed files with 15673 additions and 447 deletions
@@ -0,0 +1,50 @@
---
name: setup-help
description: "Walk a user through setup or installation one step at a time with the remaining steps visible."
category: productivity
risk: safe
source: community
source_repo: davidondrej/skills
source_type: community
date_added: "2026-07-07"
author: davidondrej
tags: [setup, onboarding, installation]
tools: [claude, codex]
license: "MIT"
license_source: "https://github.com/davidondrej/skills/blob/main/LICENSE"
disable-model-invocation: true
---
# setup-help
## When to Use
- Use when the user asks to set up, install, configure, or get something working step by step.
- Use when the setup has multiple steps and benefits from one-at-a-time guidance.
Guide the user through any setup, one step at a time, in plain English.
## Response format (every single response)
1. **Current step** — ONE atomic action. A single click, field, or command — not a checklist. 12 lines max. If it needs sub-steps, it's too big: split it and push the rest into "Still remaining". Plain English.
2. A `----` divider.
3. **Still remaining** — a numbered list of the setup steps left after this one. Max 8 items, ever.
Repeat this format for every response until setup is done.
## Rules
- Before the first step, build a complete canonical checklist from the user's outline, repo/docs, current screen, and any discovered prerequisites.
- The **Still remaining** list must never exceed 8 items — more is overwhelming. Track ALL unfinished checklist items internally; if more than 8 remain, show the nearest steps individually and merge the later ones into broader phase-level items so the list stays at 8 or fewer. Never silently drop a required step from internal tracking.
- If a new required step is discovered mid-setup, add it to **Still remaining** immediately in the correct order.
- Before every response, audit the current step plus **Still remaining** against the canonical checklist. If any unfinished step is missing, fix the list before replying.
- Only give instructions for the current step. Do not jump ahead.
- Keep it concise. Short sentences. No filler.
- After the user finishes a step, move the next "remaining" item up to "Current step".
- Update the "Still remaining" list each time as steps get done.
- When nothing remains, say setup is complete instead of showing the list.
## Limitations
- Adapted from `davidondrej/skills`; verify local paths, tools, credentials, and agent features before acting.
- For commands, remote access, scheduling, browser automation, or file-changing workflows, get explicit user approval and confirm the target environment first.